Files
gravl/.planning/STATE.md
T

2.2 KiB

Project State

Project Reference

See: .planning/PROJECT.md (updated 2026-02-15)

Core value: Logging a workout should be fast, clear, and flexible — the app never fights the user during a session Current focus: Phase 1 — Input UX

Current Position

Phase: 1 of 3 (Input UX) Plan: 3 of 3 in current phase Status: Phase 1 complete (all 3 plans done: 01, 02, 03) Last activity: 2026-02-16 — Completed 01-02 (stepper integration into WorkoutPage)

Progress: [████░░░░░░] 40%

Performance Metrics

Velocity:

  • Total plans completed: 3
  • Average duration: ~1.3 min
  • Total execution time: ~0.07 hours

By Phase:

Phase Plans Total Avg/Plan
01-input-ux 3/3 ~4 min ~1.3 min

Recent Trend:

  • Last 5 plans: 01-01 (1 min), 01-03 (2 min), 01-02 (1 min)
  • Trend: fast

Updated after each plan completion

Accumulated Context

Decisions

  • Keep existing program model; custom workouts are a fork, not a replacement
  • Frontend-only changes for Phase 1 (zero backend risk)
  • React Hook Form + Zod approved for input validation (research recommendation)
  • Do NOT modify shared program data — fork to custom_workout table for per-user changes
  • StepperInput is a pure controlled component — no internal useState, all state lives in parent
  • 44px minimum touch targets on stepper buttons for mobile usability; 16px font prevents iOS auto-zoom
  • Decimal step (2.5) uses inputMode=decimal; integer step uses inputMode=numeric
  • All App.css interactive elements have min-height: 44px; global input font-size: 16px prevents iOS auto-zoom across all form fields
  • handleInputChange already accepts plain string values — WeightInput/RepsInput onChange passes string directly, no signature changes needed
  • flex-start alignment on .set-row and .set-inputs accommodates taller stepper containers

Pending Todos

None yet.

Blockers/Concerns

  • Phase 3 requires new DB tables (custom_workouts, custom_workout_exercises) and a source_type column on workout_logs — backend schema migration needed before Phase 3 planning

Session Continuity

Last session: 2026-02-16 Stopped at: Completed 01-02-PLAN.md (stepper integration into ExerciseCard set rows) Resume file: None