Files
gravl/.pm-checkpoint.json
T
clawd d81e403f01 Phase 06 Tier 1: Complete Backend Implementation - Recovery Tracking & Swap System
COMPLETED TASKS:
 06-01: Workout Swap System
   - Added swapped_from_id to workout_logs
   - Created workout_swaps table for history
   - POST /api/workouts/:id/swap endpoint
   - GET /api/workouts/available endpoint
   - Reversible swaps with audit trail

 06-02: Muscle Group Recovery Tracking
   - Created muscle_group_recovery table
   - Implemented calculateRecoveryScore() function
   - GET /api/recovery/muscle-groups endpoint
   - GET /api/recovery/most-recovered endpoint
   - Auto-tracking on workout log completion

 06-03: Smart Workout Recommendations
   - GET /api/recommendations/smart-workout endpoint
   - 7-day workout analysis algorithm
   - Recovery-based filtering (>30% threshold)
   - Top 3 recommendations with context
   - Context-aware reasoning messages

DATABASE CHANGES:
- Added 4 new tables: muscle_group_recovery, workout_swaps, custom_workouts, custom_workout_exercises
- Extended workout_logs with: swapped_from_id, source_type, custom_workout_id, custom_workout_exercise_id
- Created 7 new indexes for performance

IMPLEMENTATION:
- Recovery service with 4 core functions
- 2 new route handlers (recovery, smartRecommendations)
- Updated workouts router with swap endpoints
- Integrated recovery tracking into POST /api/logs
- Full error handling and logging

TESTING:
- Test file created: /backend/test/phase-06-tests.js
- Ready for E2E and staging validation

STATUS: Ready for frontend integration and production review
Branch: feature/06-phase-06
2026-03-06 20:54:03 +01:00

125 lines
5.7 KiB
JSON

{
"lastRun": "2026-03-06T20:16:00+01:00",
"status": "completed",
"phase": "10-07",
"task": "10-07-05",
"taskName": "Production Readiness Review",
"stage": "completed",
"result": "✅ All production readiness deliverables complete | Sign-off checklist created | 4 critical blocking items identified for pre-launch completion",
"deliverables": {
"productionReadinessChecklistDoc": "✅ docs/PRODUCTION_READINESS.md (created)",
"securityReviewDoc": "✅ Included in PRODUCTION_READINESS.md",
"loadTestingPlan": "✅ k8s/production/load-test.js (k6 script)",
"goLiveProcedure": "✅ docs/PRODUCTION_GODEPLOY.md (created)",
"rollbackProcedure": "✅ docs/ROLLBACK.md (created)",
"signOffChecklist": "✅ docs/PRODUCTION_SIGN_OFF.md (created)"
},
"blockingIssuesStatus": {
"lokiStorageIssue": {
"status": "❌ UNRESOLVED",
"description": "Loki in CrashLoopBackOff (161 restarts) — StorageClass mismatch",
"recommendation": "Use emptyDir for staging, deploy proper provisioner for production",
"deferrable": true,
"canDeferUntil": "Post-launch (24 hours)"
},
"backupCronjobNotDeployed": {
"status": "❌ NOT DEPLOYED",
"description": "Backup manifest exists but not applied to cluster",
"fixCommand": "kubectl apply -f k8s/backup/postgres-backup-cronjob.yaml",
"estimatedTime": "5 minutes",
"required": true
},
"alertmanagerEndpointsNotConfigured": {
"status": "❌ NOT CONFIGURED",
"description": "AlertManager routing rules present but not sending to Slack/email",
"fixCommand": "Configure Slack webhook + SMTP in k8s/staging/alertmanager-config.yaml",
"estimatedTime": "30 minutes",
"required": true
}
},
"criticalPathToProduction": {
"blocking_1_certManager": {
"status": "⏳ PENDING",
"estimatedTime": "1 hour",
"critical": true
},
"blocking_2_secretsManagement": {
"status": "⏳ PENDING",
"estimatedTime": "1.5 hours",
"critical": true
},
"blocking_3_loadTest": {
"status": "⏳ PENDING",
"estimatedTime": "30 minutes",
"critical": true
},
"blocking_4_alertmanagerConfiguration": {
"status": "⏳ PENDING",
"estimatedTime": "30 minutes",
"critical": true
},
"critical_5_backupCronjob": {
"status": "⏳ PENDING",
"estimatedTime": "15 minutes",
"critical": false
}
},
"signOffStatus": {
"architectReview": "⏳ PENDING",
"devopsReview": "⏳ PENDING",
"backendLeadReview": "⏳ PENDING",
"ctoApproval": "⏳ PENDING"
},
"productionReadyScore": "4/10",
"productionRecommendation": "🟠 CONDITIONAL GO-LIVE — Blocking items must be completed within 4-6 hours",
"estimatedTimeToProduction": "2026-03-07T00:16:00+01:00",
"acceptanceCriteria": {
"allDeliverablesDone": true,
"securityReviewComplete": true,
"loadTestScriptReady": true,
"rollbackProcedureDocumented": true,
"signOffChecklistCreated": true,
"blockingIssuesIdentified": true,
"criticalPathDefined": true,
"readyForSignOff": true
},
"nextActions": [
"→ Deploy cert-manager + ClusterIssuer",
"→ Implement sealed-secrets OR External Secrets Operator",
"→ Execute load test (k6 run k8s/production/load-test.js)",
"→ Configure AlertManager endpoints (Slack/email)",
"→ Deploy backup cronjob",
"→ Rotate DB credentials to 32+ char password",
"→ Add DNS egress NetworkPolicy",
"→ Schedule team sign-off meeting",
"→ Execute go-live procedure from PRODUCTION_GODEPLOY.md"
],
"completedSteps": [
"✅ Created production deployment checklist",
"✅ Conducted security review (RBAC, network policies, secrets management)",
"✅ Wrote k6 load testing script (k8s/production/load-test.js)",
"✅ Documented production go-live procedure (PRODUCTION_GODEPLOY.md)",
"✅ Created detailed rollback procedure (ROLLBACK.md)",
"✅ Created production sign-off checklist (PRODUCTION_SIGN_OFF.md)",
"✅ Identified critical path items (4 blocking, 3 critical)",
"✅ Assessed production readiness (4/10 criteria met)",
"✅ Defined success criteria and sign-off authority"
],
"documentation": {
"PRODUCTION_READINESS.md": "✅ Complete — Security review, RBAC, network policies, secrets management, deployment checklist",
"ROLLBACK.md": "✅ Complete — Detailed rollback scenarios, procedures, incident response checklist",
"PRODUCTION_GODEPLOY.md": "✅ Complete — Step-by-step deployment procedure, pre-flight checklist, health checks",
"PRODUCTION_SIGN_OFF.md": "✅ Complete — Go/no-go decision matrix, blocking criteria, sign-off authority, risk assessment",
"load-test.js": "✅ Complete — k6 script with 3 test scenarios, configurable thresholds (p95 <200ms, error rate <0.1%)"
},
"branch": "feature/10-phase-10",
"testedBy": "Gravl-Architect-10-07-05",
"testingDate": "2026-03-06T20:16:00+01:00",
"unblocked": true,
"readyForNextPhase": true,
"productionReady": false,
"productionReadinessNotes": "All deliverables complete. Production readiness conditional on completion of 4 blocking items (cert-manager, sealed-secrets, load test, AlertManager config) + 3 critical items (backup, credentials, network policy). Recommend 4-6 hour timeline to production-ready status.",
"phaseProgress": "5/5 tasks complete (100%) ✅ PHASE 10-07 COMPLETE",
"phaseSummary": "Phase 10-07 (Production Deployment & Validation) successfully completed. All 5 tasks delivered: environment setup, service deployment, integration testing, monitoring validation, and production readiness review. Staging environment operational (67% monitoring). Ready for production launch after blocking items resolved."
}